|
Convenience Stores in Oakland city
|
The client had a convenience
store in Oakland city. He was about to replace his old electrical panels,
put some new lights and remodel the restroom to comply with disability
codes. To install new electrical panels the PG&E required approved set
of plans from the city of Oakland. Bolt Design Studio provided the cover
page, site plan, existing floor plans, electrical plan and equipment
schedule. |
|
Here is few pages of the
work: |
|
|
On a top picture you see the floor plan of
the store, it was a little bit corrected, but based on original files
the client came with. |
|
|
This is an electrical plan for the store with
position of all electrical panels. |
|
|
This picture shows the room and equipment
schedule for the store. |
|