Bolt Design Studio  
Building plans and permits 408 . 646 . 2195
     Home ·  Services ·  How it works ·  Recent work ·  FAQ ·  City Links ·  Contact
 
 

Remodeling in Saratoga city

   The client came with an idea to enlarge the kitchen by removing bearing wall between the hall and the kitchen, remodel the master bathroom and add walk-in closet to master bedroom. The house was build in 1972 and the client didn't have any of the original plans for it. We came to the site and measured the whole property inside and outside. After that the existing plans were made, we worked on proposed changes. He thought he will need the structural engineer to check the drawings since he was removing few bearing walls. In his case the existing, proposed and electrical plans were enough for the city to approve his remodeling. One thing to understand is that at the city structural engineer and architect will be checking your plans. They have to approve your plans, than you will receive one copy to be present on site during construction, so your contractor can use approved plans for construction.
 
Here is few pages of the work:
 
floor plans img1
On a top picture you see existing floor plans for the house.
 
proposed floor plan img
On a second drawing pictures the proposed floor plan with new walls and changes noted.
 
 
 
 
Additions and remodeling plans in San Jose - Bolt Design Studio
 
© COPYRIGHT 2004 ALL RIGHTS RESERVED Bolt Design Studio